![]() Topic: Interview questions of Production Planning..Posted: 09May2007 at 3:06am |
|
Hi buddies,
I am not getting PP interview questions anywhere so try to post this... thanks, Ravi Post Resume: Click here to Upload your Resume & Apply for Jobs |
|
IP Logged |
|
|
mallaika
Newbie
Joined: 09May2007 Online Status: Offline Posts: 1 |
![]() Posted: 09May2007 at 3:08am |
|
Q: How to configure the planning calendar for the ATP calculation where goods are shipped every other working day?
Q: We have two different production lines with different operations. One production line works 5 days a week and the other 7 days a week. The factory calendar is assigned to the plant for 5 days a week. This calendar is checked when MRP is run. How can we assign 5 day a week and 7 days a week against a factory calendar to the related resources? Is it possible to have two types of calendars? A: Assign factory calendars to the work centers.
Q: What is the difference between by-product and co-product and how do you differentiate them in a BOM?
Q: What are some important tables used in PP ? A: For orders: AFPO - Order item MOPER Operation for production order AFRU Order completion confirmations SAFRU Sub-operation confirmations MRP table is MDTB. AFFT Order Process Instructions Some other tables of interest: Q: We have a BOM
- 'A' with two packing materials 'X' and 'Y'. For 1000 units of 'A', 1
packing material of 'X' is required and for 50 units of 'A', 1 packing
material of 'Y' is required. Base quantity of 'A' is defined as 1000. How can I define 'X' & 'Y' or in fact 'A'? Q: Can we have more than 6 standard values in standard value key? Q: Can we use same routing for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced? Q: Scheduling times can be defined in the material master record by; Q: We have deleted
a group key in an operation in routing and the same does not appear for
this routing (CA02). But we noticed that entries are maintained in
table PLPO and the deletion indicator is not set. How does the system
remember this deletion of group key? Sales & Operations Planning Q: We defined SOP in months. However during SOP transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months ? Q: Sales
quantities in SOP for certain days are transferred into Demand
Management and are shown as planned independent requirements. We need
to keep the settings in SOP and change the periods in Demand Management? We would like to have a rolling horizon, for ex: the following 4 weeks on a daily basis, after that on a monthly basis. What is the best way to do this? Q: We have a lot size procedure here which is creating more order proposals. How do you set the limit value for maximum number of MRP order proposals per date in IMG? Q: What is the difference between "planned consumption" and "Unplanned consumption"? Can safety stock calculation be done on either of these? Q:
We want the system to run a single level MRP automatically on receipt
of sales order. How to configure triggering event based MRP? Q: We
have an assembly 'A' using a subassembly 'B'. 'B' in turn uses raw
material 'C'. Item 'A' is an MPS and is duly marked in Material Master.
Item 'B' and 'C' are marked as 'PD'. When demand for 'A' is entered and
MPS is run , upto which level the requirements are taken care of?
Without marking the checkbox " Process MRP materials" is like case ( 1) above and with the checkbox marked is like case (2 ).
Q: We get an error message "Control parameters for scheduling not defined" while creating test production Orders. Why?
Q: We are trying to create Purchase Requisition from MRP run. We have material , info Record, Source list , Demand in place. MRP is always creating plan order. Why?
Q: what is the option "Documented goods movements" on Selection of Individual Object Lists (transaction code CO28)?
Q: We would like to have a report/inquiry
that would indicate variances (materials, material quantities) between
material recipe and actual process orders. We tried ME2M but this gives
us a list of purchasing documents and not the consumption deviation.
Where can I get such consumption deviation (master recipe Vs. Process> Orders)?
Q:
We have two components ( 'X' & 'Y' ) in a production order in a
process oriented production process. When 50 numbers of component 'X'
are issued, we need the system to automatically issue 100 numbers of component 'Y' based on ratio of 1 to 2. Where do I specify these ratios?
Q: We have two storage locations are '0001' and '0600'. Default storage location in Process order is always '0001' What determines this default location?
Q: We need to do GI of components to production order using Back-flush. The component stock is managed in Batches. The Batch to be back-flushed
Q: We want to report on several status combinations like each order that has status 'Not deleted' and 'Not technically completed'. What set up is required?
Q: How can we shut off the "automatic costing indicator" and the "automatic scheduling indicator" which go on when the production order is released?
Q: How can I use variable size items? A: For example, consider an item A with 'kg' as base Unit Of Measurement(UOM) and 'm3' as stock keeping/issue unit. Conversion factor is 1kg = 2.4 m3.In the BOM of 'B' ,number of A required are specified (say 5). Specify the 3 variable dimensions i.e. length, width & thickness- say 2000mm X 3000mm X 4mm = 0.024 m3 As per BOM - 'B' , the quantity of A required is 0.024 X 5 = 0.120 m3 If a production Order is released for 15 numbers of 'B' , the quantity of variable size unit will be 1.20 m3. You can change the length, width or thickness in the production order & check the resulting variable size item quantity. At the same time this requirement can be seen in 'kg' in stock/requirement list. |
|
IP Logged |
|
|
abhiguha79
Newbie
Joined: 10May2007 Location: India Online Status: Offline Posts: 1 |
![]() Posted: 10May2007 at 7:37am |
|
thanks malaika for the questions they are really helpful for freshers like us.
thanks!!
|
|
|
sap world is a huge ocean!!!
|
|
IP Logged |
|
|
vineetdgr8
Newbie
Joined: 10May2007 Online Status: Offline Posts: 1 |
![]() Posted: 11May2007 at 12:07am |
|
1. Can MRP be carried out for one particular
level of a bom ( Level code : 0001/0002 etc).
2 How Requiements( PIR,Sles Order,
Customer Requirement) are reduced after they are produced?
3. Can't one material be assigned to
more than one operation in a routing?
4. How to insert an inspection checkpoint
at the end of an operation?
5. Where we have to specify the teardown
time in one operation?
6. How the process time is calculated
in a WC when both labour, Machine categories exist?
7. How to create opbject dependencies
in a BOM FOR A CONFIGURABLE MATERIAL?
8. Can any body explain me why work scheduling
view is required for semi finished and finished products?
|
|
IP Logged |
|
|
nilesh_pojge
Newbie
Joined: 20Feb2008 Online Status: Offline Posts: 1 |
![]() Posted: 20Feb2008 at 4:40am |
|
Dear Ravi, I have some question on PP module,i will give u as soon as possible,but u gv me ur mail id.
Nilesh
|
|
IP Logged |
|
|
selvant
Newbie
Joined: 20Jun2008 Location: India Online Status: Offline Posts: 1 |
![]() Posted: 28Jun2008 at 3:11pm |
|
Thanks guys for your kind contribution.
|
|
IP Logged |
|
|
Thimmaiah
Newbie
Joined: 25Jun2009 Location: India Online Status: Offline Posts: 1 |
![]() Posted: 25Jun2009 at 6:35am |
|
hi
can you plz give PP question and answer details to thimsdurga@gmail.com? |
|
|
With warm Regards,
Thimmaiah |
|
IP Logged |
|
|
onlyselva
Newbie
Joined: 10Dec2009 Location: India Online Status: Offline Posts: 1 |
![]() Posted: 10Dec2009 at 2:40am |
|
hi i am selva i am a sap pp fresher..pl give me the pp model interview questions pl..my mail id cselvz@yahoo.in
|
|
IP Logged |
|
|
jerryvn01
Newbie
Joined: 29Jun2010 Online Status: Offline Posts: 8 |
![]() Posted: 29Jun2010 at 10:48am |
|
Originally posted by vineetdgr8 1. Can MRP be carried out for one particular
level of a bom ( Level code : 0001/0002 etc).
2 How Requiements( PIR,Sles Order,
Customer Requirement) are reduced after they are produced?
3. Can't one material be assigned to
more than one operation in a routing?
4. How to insert an inspection checkpoint
at the end of an operation?
5. Where we have to specify the teardown
time in one operation?
6. How the process time is calculated
in a WC when both labour, Machine categories exist?
7. How to create opbject dependencies
in a BOM FOR A CONFIGURABLE MATERIAL?
8. Can any body explain me why work scheduling
view is required for semi finished and finished products?
Hi Thanks very much for this comment. It help me to thimk about my ideals. Apart from that , this link below may be useful: Accounting interview questions Tks again and pls keep posting Edited by jerryvn01 - 26Jul2010 at 8:13am |
|
IP Logged |
|
|
||